B&A Construction Ltée

B&A Construction Ltée

Chamber Rating

3.1 - (8 reviews)
3
1
1
0
3
Read Our 8 Reviews

Chamber Rating

3.1 - (8 reviews)
3
1
1
0
3
  • Captain Experience


    Aug 4th, 2022

  • SHARA M

    (Translated by Google) Always attentive to the needs of their customers, much appreciated. Thank you all. (Original) Toujours l'coute des besoins de leurs clients, trs apprci. Merci tous.
    Jun 9th, 2022

  • Cristian David

    Positive: Punctuality, Responsiveness
    May 9th, 2022

  • Elhan Saheed

    Critical: Punctuality, Quality, Value
    Sep 7th, 2021

  • mahmoud farhat

    (Translated by Google) Communication was very difficult with the builder on several elements throughout the construction. We had to fight to correct certain points. In addition, we brought in a qualified building inspector and he noted some minor defects in the house. Because there are some elements that the manufacturer (Mr. Alain Bolduc) did not want to correct, we therefore called on the GCR. A few neighbors share my opinion. 1) we took possession of the house on March 26, and since we still have no plumbing for the bath in the master bathroom, when we ask for a follow-up, the answer: the faucet is not still available is told us that there is no date to give us. One asks for a temporary plumbing to use the bath and the answer is NO. we are on May 5, still not able to use the bath, nor the 2nd tap. ( view the photo ) . We learn that the plumbing arrived the last week of April. The plumber refuses to come and install it right away because he says he's waiting for other parts and just wants to pay a visit. Note: this last work in the house opposite for the same builder. Despite knowing that we can't wait to use the bath and have been waiting for more than a month. He makes no effort to place it. 2) the wooden floor in the family room is not equal to the ceramic in the kitchen. This point is not acceptable to us and the building inspector confirms the non-compliance, on the other hand the builder refuses the correction (see photo). The manufacturer tells us that they placed cardboard under the floor to overcome the floor and reach the level of the ceramic. wow what a technique. 3) After paying an extra $475 (for an area of 88 sq.ft.) for the installation of decorative ceramic in the master bathroom, the subcontractor decides to install the cut ceramic completely at the top of the decorative wall instead of put the cut part behind the bath. When we raise this point to the builder, the latter says that it is normal because he does not want to have a big joint in the wall. (It seems to me that a ceramic installer is able to take measurements). Manufacturer completely refuses to cooperate on this point despite the large price charged without even notice. ( view the photo) 4) Two burnt lights in the facade of the house since taking possession on March 26th. Made in May, still not changed the 2 lights. Excuse: no time. Electrician working in the house opposite. ( view the photo ) 5 ) Even before taking possession of the house . a crack in the foundation was found. At the very beginning, the contactor refuses the repair and says that he only repairs in case of water infiltration. After the passage of the inspector, the latter requires in his report the repair and especially by a professional. Mr. Bolduc decides to repair himself after several requests. The latter has his worker dig 24'' and the latter applies a black product in the underground part and concrete in the upper part. Wow what a repair ( View the photo ) 6) After an error made by the builder on the master bedroom division and the walk-in (communication error between him and his seller according to us). The latter refuses to make the correction and his answer '' it's too late '' unfortunately we have to live with 7) Ceramic in the bathroom is not level according to the inspector. this has been checked with a level. Mr. Bolduc refuses the correction. ( view the photo ) Awaiting New Home Warranty to be continued.... -------------------------------------------------- ------------------------- On April 27, we receive a formal notice from Mr. Alain Bolduc's lawyer asking to withdraw our comments on google or legal proceedings will be instituted against us. May 7, plumbing completed and lights changed. (Original) La communication tait trs difficile avec le constructeur sur plusieurs lments tout au long de la construction. Il fallait se battre pour corriger certains points. De plus, nous avons fait venir un inspecteur en btiment qualifi et il a relev certains dfauts mineurs dans la maison. Parce qu'il y a quelques lments que le constructeur ( M. Alain Bolduc ) n'a pas voulu corriger, nous avons fait donc appel a la GCR. Quelque voisinage partage mon opinion. 1) nous avons pris possession de la maison le 26 mars , et depuis nous n'avons toujours pas de plomberie pour le bain de la salle de bain des matres, quand on demande pour un suivi , la rponse : le robinet n'est pas encore disponible est nous dit qu'il y a pas de date nous donner. On demande pour une plomberie temporaire pour utiliser le bain et la rponse est NON . nous sommes le 5 mai , toujours pas capable d'utiliser le bain , ni le 2e robinet . ( voir photo ) . On apprend que la plomberie est arrive la dernire semaine d'avril. Le plombier refuse de passer l'installer tout de suite parce qu'il dit qu'il attend aprs d'autre pices et qu'il veut seulement faire une visite . Note : ce dernier travail dans la maison en face pour le mme constructeur . Malgr sa connaissance que nous avons hte dutiliser le bain et que nous attendions depuis plus qu'un mois . Il fait aucun effort pour le placer. 2) le plancher en bois dans la salle familiale n'est pas gal la cramique de la cuisine. Ce point n'est pas acceptable par nous et l'inspecteur en btiment confirme la non-conformit , par contre le constructeur refuse la correction ( voir photo ). Le constructeur nous divulgue qu'ils ont plac du carton en dessous du plancher pour surmonter le plancher et arriver au niveau de la cramique . woow quel technique . 3) Apres avoir pay 475$ extra ( pour une superficie 88 p.c. ) pour la pose de la cramique de dcoration dans la salle de bain matre, le sous-traitant dcide de poser la cramique coup compltement dans le haut du mur dcorative au lieu de mettre la partie coupe derrire le bain . Quand on relve ce point au constructeur , ce dernier dit que c'est normal par qu'il ne veux pas avoir un gros joint dans du mur . ( il me semble que un poseur de cramique est capable de prendre de mesure ) . Constructeur refuse compltement de cooprer sur ce point malgr le gros prix charg sans mme un pravis . ( voir photo) 4) Deux lumires de brles dans la faade de la maison depuis la prise de possession le 26 mars . Rendu en mai , toujours pas chang les 2 lumires. Excuse : pas le temps . lectricien travail dans la maison en face. ( voir photo ) 5 ) Avant mme de prendre Possession de la maison . une fissure dans la fondation a t releve . Tout au dbut , le contacteur refuse la rparation et dit qu'il rpare seulement en cas dinfiltration d'eau . Apres le passage l'inspecteur , ce dernier exige dans son rapport la rparation et surtout par un professionnel . M.Bolduc dcide de rparer lui mme aprs plusieurs demande. Ce dernier fait creuser 24'' par son ouvrier et ce dernier applique un produit noir dans la partie de sous terre et du bton dans la partie du haut . Woow quel rparation ( Voir photo ) 6 ) Apres une erreur commis par le constructeur sur le division de chambre matre et le walk-in ( erreur de communication entre lui et son vendeur selon nous ) . Ce dernier refuse de faire la correction et sa rponse '' il est trop tard '' malheureusement nous devons vivre avec 7 ) Cramique dans la salle d'eau n'est pas a niveau selon l'inspecteur . ceci a t vrifier avec un niveau . M. Bolduc refuse la correction . ( voir photo ) En attente de de la Garantie de maison neuf a suivre.... --------------------------------------------------------------------------- Le 27 avril , nous recevons une mise en demeure de la part de l'avocate de M. Alain Bolduc demandant de retirer nos commentaires sur google ou des procdures judiciaires seront institues contre nous . le 7 mai , plomberie complte et lumires changes. Services: Waterproofing, Install flooring, Paint indoors, Design, Tile work installation, Exterior painting, Flooring, Plumbing fixture installation, Fan installation, Project management
    Oct 3rd, 2021

Read Our 8 Reviews

About
B&A Construction Ltée

B&A Construction Ltée is located at 3688 Bd Dagenais O in Laval, Quebec H7P 1V9. B&A Construction Ltée can be contacted via phone at 450-628-3518 for pricing, hours and directions.

Contact Info

  •   450-628-3518

Questions & Answers

Q What is the phone number for B&A Construction Ltée?

A The phone number for B&A Construction Ltée is: 450-628-3518.


Q Where is B&A Construction Ltée located?

A B&A Construction Ltée is located at 3688 Bd Dagenais O, Laval, QC H7P 1V9


Q What is the internet address for B&A Construction Ltée?

A The website (URL) for B&A Construction Ltée is: http://www.baconstruction.ca/


Q How is B&A Construction Ltée rated?

A B&A Construction Ltée has a 3.1 Star Rating from 8 reviewers.

Ratings and Reviews
B&A Construction Ltée

Overall Rating

Overall Rating
( 8 Reviews )
3
1
1
0
3
Write a Review

Captain Experience on Google

image


SHARA M on Google

image (Translated by Google) Always attentive to the needs of their customers, much appreciated. Thank you all.
(Original)
Toujours l'coute des besoins de leurs clients, trs apprci. Merci tous.


Cristian David on Google

image Positive: Punctuality, Responsiveness


Elhan Saheed on Google

image Critical: Punctuality, Quality, Value


mahmoud farhat on Google

image (Translated by Google) Communication was very difficult with the builder on several elements throughout the construction. We had to fight to correct certain points. In addition, we brought in a qualified building inspector and he noted some minor defects in the house. Because there are some elements that the manufacturer (Mr. Alain Bolduc) did not want to correct, we therefore called on the GCR.
A few neighbors share my opinion.
1) we took possession of the house on March 26, and since we still have no plumbing for the bath in the master bathroom, when we ask for a follow-up, the answer: the faucet is not still available is told us that there is no date to give us.
One asks for a temporary plumbing to use the bath and the answer is NO. we are on May 5, still not able to use the bath, nor the 2nd tap. ( view the photo ) .
We learn that the plumbing arrived the last week of April. The plumber refuses to come and install it right away because he says he's waiting for other parts and just wants to pay a visit.
Note: this last work in the house opposite for the same builder. Despite knowing that we can't wait to use the bath and have been waiting for more than a month. He makes no effort to place it.
2) the wooden floor in the family room is not equal to the ceramic in the kitchen. This point is not acceptable to us and the building inspector confirms the non-compliance, on the other hand the builder refuses the correction (see photo).
The manufacturer tells us that they placed cardboard under the floor to overcome the floor and reach the level of the ceramic.
wow what a technique.
3) After paying an extra $475 (for an area of 88 sq.ft.) for the installation of decorative ceramic in the master bathroom, the subcontractor decides to install the cut ceramic completely at the top of the decorative wall instead of put the cut part behind the bath. When we raise this point to the builder, the latter says that it is normal because he does not want to have a big joint in the wall. (It seems to me that a ceramic installer is able to take measurements). Manufacturer completely refuses to cooperate on this point despite the large price charged without even notice. ( view the photo)
4) Two burnt lights in the facade of the house since taking possession on March 26th. Made in May, still not changed the 2 lights.
Excuse: no time.
Electrician working in the house opposite.
( view the photo )
5 ) Even before taking possession of the house . a crack in the foundation was found. At the very beginning, the contactor refuses the repair and says that he only repairs in case of water infiltration. After the passage of the inspector, the latter requires in his report the repair and especially by a professional. Mr. Bolduc decides to repair himself after several requests. The latter has his worker dig 24'' and the latter applies a black product in the underground part and concrete in the upper part.
Wow what a repair
( View the photo )
6) After an error made by the builder on the master bedroom division and the walk-in (communication error between him and his seller according to us).
The latter refuses to make the correction and his answer '' it's too late ''
unfortunately we have to live with
7) Ceramic in the bathroom is not level according to the inspector.
this has been checked with a level. Mr. Bolduc refuses the correction.
( view the photo )
Awaiting New Home Warranty
to be continued....
-------------------------------------------------- -------------------------
On April 27, we receive a formal notice from Mr. Alain Bolduc's lawyer asking to withdraw our comments on google or legal proceedings will be instituted against us.
May 7, plumbing completed and lights changed.
(Original)
La communication tait trs difficile avec le constructeur sur plusieurs lments tout au long de la construction. Il fallait se battre pour corriger certains points. De plus, nous avons fait venir un inspecteur en btiment qualifi et il a relev certains dfauts mineurs dans la maison. Parce qu'il y a quelques lments que le constructeur ( M. Alain Bolduc ) n'a pas voulu corriger, nous avons fait donc appel a la GCR.
Quelque voisinage partage mon opinion.
1) nous avons pris possession de la maison le 26 mars , et depuis nous n'avons toujours pas de plomberie pour le bain de la salle de bain des matres, quand on demande pour un suivi , la rponse : le robinet n'est pas encore disponible est nous dit qu'il y a pas de date nous donner.
On demande pour une plomberie temporaire pour utiliser le bain et la rponse est NON . nous sommes le 5 mai , toujours pas capable d'utiliser le bain , ni le 2e robinet . ( voir photo ) .
On apprend que la plomberie est arrive la dernire semaine d'avril. Le plombier refuse de passer l'installer tout de suite parce qu'il dit qu'il attend aprs d'autre pices et qu'il veut seulement faire une visite .
Note : ce dernier travail dans la maison en face pour le mme constructeur . Malgr sa connaissance que nous avons hte dutiliser le bain et que nous attendions depuis plus qu'un mois . Il fait aucun effort pour le placer.
2) le plancher en bois dans la salle familiale n'est pas gal la cramique de la cuisine. Ce point n'est pas acceptable par nous et l'inspecteur en btiment confirme la non-conformit , par contre le constructeur refuse la correction ( voir photo ).
Le constructeur nous divulgue qu'ils ont plac du carton en dessous du plancher pour surmonter le plancher et arriver au niveau de la cramique .
woow quel technique .
3) Apres avoir pay 475$ extra ( pour une superficie 88 p.c. ) pour la pose de la cramique de dcoration dans la salle de bain matre, le sous-traitant dcide de poser la cramique coup compltement dans le haut du mur dcorative au lieu de mettre la partie coupe derrire le bain . Quand on relve ce point au constructeur , ce dernier dit que c'est normal par qu'il ne veux pas avoir un gros joint dans du mur . ( il me semble que un poseur de cramique est capable de prendre de mesure ) . Constructeur refuse compltement de cooprer sur ce point malgr le gros prix charg sans mme un pravis . ( voir photo)
4) Deux lumires de brles dans la faade de la maison depuis la prise de possession le 26 mars . Rendu en mai , toujours pas chang les 2 lumires.
Excuse : pas le temps .
lectricien travail dans la maison en face.
( voir photo )
5 ) Avant mme de prendre Possession de la maison . une fissure dans la fondation a t releve . Tout au dbut , le contacteur refuse la rparation et dit qu'il rpare seulement en cas dinfiltration d'eau . Apres le passage l'inspecteur , ce dernier exige dans son rapport la rparation et surtout par un professionnel . M.Bolduc dcide de rparer lui mme aprs plusieurs demande. Ce dernier fait creuser 24'' par son ouvrier et ce dernier applique un produit noir dans la partie de sous terre et du bton dans la partie du haut .
Woow quel rparation
( Voir photo )
6 ) Apres une erreur commis par le constructeur sur le division de chambre matre et le walk-in ( erreur de communication entre lui et son vendeur selon nous ) .
Ce dernier refuse de faire la correction et sa rponse '' il est trop tard ''
malheureusement nous devons vivre avec
7 ) Cramique dans la salle d'eau n'est pas a niveau selon l'inspecteur .
ceci a t vrifier avec un niveau . M. Bolduc refuse la correction .
( voir photo )
En attente de de la Garantie de maison neuf
a suivre....
---------------------------------------------------------------------------
Le 27 avril , nous recevons une mise en demeure de la part de l'avocate de M. Alain Bolduc demandant de retirer nos commentaires sur google ou des procdures judiciaires seront institues contre nous .
le 7 mai , plomberie complte et lumires changes. Services: Waterproofing, Install flooring, Paint indoors, Design, Tile work installation, Exterior painting, Flooring, Plumbing fixture installation, Fan installation, Project management


Load More Reviews

Overall Rating

Overall Rating
( 8 Reviews )
3
1
1
0
3

Write a Review

RATING:
Create 1 Star Review Create 2 Star Review Create 3 Star Review Create 4 Star Review Create 5 Star Review

Home Builder Near Me in Laval, QC

Habitation MÉGATECH
73 Rue de la Pointe-Langlois
Laval, QC H7L 3J4
450-934-8084
( 18 Reviews )
Big Design Inc
919 Rue Jules-Huot #310
Laval, QC H7W 0K1
438-488-3875
( 0 Reviews )
MADECO - ALLARD - MÉNARD (Royal St-Martin - Maisons Unifamiliales)
4589 Desserte Nord Autoroute 440 #200
Laval, QC H7P 0J7
450-686-4006
( 7 Reviews )
Habitations LUXIM
CP 52058 CSP
Laval, QC H7P 5S1
514-992-2834
( 3 Reviews )
ATP Immo Inc.
26 Bellerose Blvd E
Laval, QC H7K 1S4
514-594-8732
( 0 Reviews )
Rnovation AAZ Plus Inc. - Rnovation de salle de bains et agrandissement Montral et Laval
1813 Boulevard des Laurentides
Laval, QC H7M 2P7
(514) 435-3011
( 5 Reviews )
Rénovert Solutions
154 Rue Lamarche
Laval, QC H7X 4E6
514-653-8378
( 0 Reviews )
Balcon rive nord
111 Rue de la Pointe-Langlois
Laval, QC H7L 3J4
450-628-9858
( 0 Reviews )
ChamberofCommerce.com
Loading